Required information | | | | |
Please enter if available | | | | |
| | | | | |
| | | | | |
Property name | | | |
Official property reference | | | |
Address | | | |
Municipality | | | |
| | | | | |
Current room temperature | | °C | | | |
Highest temp in heating system | | °C | | | |
Heated area (Atemp) | | m2 | | | |
Number of apartments | | st | | | |
Number of buildings | | st | | | |
Number of existing substations | | st | | | |
| | | | | |
Information from district heating bills during one continuous year. | | | | | |
Year | | | | | |
| | | | | |
Month | Energy consumption | Power factor | Return temp. Bonus/fee (+/-) | Hot water consumption * |
| kWh | kW | SEK | m2 |
Jan | | | | |
Feb | | | | |
Mar | | | | |
Apr | | | | |
May | | | | |
Jun | | | | |
Jul | | | | |
Aug | | | | |
Sep | | | | |
Oct | | | | |
Nov | | | | |
Dec | | | | |
* To be provided if there are measurements on the cold water pipe going into the hot water exchanger for the boiler. | | | | | |
| | | | | |
Energy costs | | | | | |
(Please attach agreements or a copy of bill that clearly details the various costs.) | | | | | |
| | | | | |
Electricity grid: | | | | Electricity cost (excl. VAT) | |
Grid supplier: | | | Electricity tax | öre/kWh |
Grid contract: | | | Energy tax | öre/kWh |
| | | | | |
Cost of electricity (excl. VAT) | | | | | |
Contract | SEK/month | | | | |
Electricity transfer | öre/kWh | | | | |
Power | SEK/kW/month | | | | |
| | | | | |
District heating (excl. VAT) | | | | | |
District heating supplier | | |
Contract ID/type | | |
| | | | | |