To be able to start a project calculation, we require certain technical information from our customers. This technical information is specified in the following sheets for: New Buildings & Existing Buildings.

REQUIRED INFORMATION: NEW BUILDING

Required information

 

 

 

 

 

 

 

Property name

 

 

Official property reference

 

 

Address

 

 

Municipality

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Estimated power need: Transmission

kW

 

 

Highest temperature in the heating system: Transmission

°C

 

 

Estimated power need: Ventilation

kW

 

 

Highest temperature in the heating system: Ventilation

°C

 

 

Estimated power need: Hot water

kW/hour

 

 

Estimated room temperature

°C

 

 

Heated area (Atemp)

m2

 

 

Number of apartments

units

 

 

Number of buildings

units

 

 

Number of substations

units

 

 

 

 

 

 

Electricity grid

 

 

 

Grid owner

 

 

Grid contract most likely to be signed

 

 

 

 

 

 

Electric energy cost

 

 

 

Expected electric energy cost

öre/kWh

 

(excl. VAT)

 

 

 

 

 

 

 

 

REQUIRED INFORMATION: EXISTING BUILDING

Required information

 

 

 

 

Please enter if available

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Property name

 

 

 

Official property reference

 

 

 

Address

 

 

 

Municipality

 

 

 

 

 

 

 

 

 

Current room temperature

 

°C

 

 

 

Highest temp in heating system

 

°C

 

 

 

Heated area (Atemp)

 

m2

 

 

 

Number of apartments

 

st

 

 

 

Number of buildings

 

st

 

 

 

Number of existing substations

 

st

 

 

 

 

 

 

 

 

 

Information from district heating bills during one continuous year.

 

 

 

 

 

Year

 

 

 

 

 

 

 

 

 

 

 

Month

Energy consumption

Power factor

Return temp.
Bonus/fee
(+/-)

Hot water
consumption *

 

kWh

kW

SEK

m2

Jan

 

 

 

 

Feb

 

 

 

 

Mar

 

 

 

 

Apr

 

 

 

 

May

 

 

 

 

Jun

 

 

 

 

Jul

 

 

 

 

Aug

 

 

 

 

Sep

 

 

 

 

Oct

 

 

 

 

Nov

 

 

 

 

Dec

 

 

 

 

* To be provided if there are measurements on the cold water pipe going into the hot water exchanger for the boiler.

 

 

 

 

 

 

 

 

 

 

 

Energy costs

 

 

 

 

 

(Please attach agreements or a copy of bill that clearly details the various costs.)

 

 

 

 

 

 

 

 

 

 

 

Electricity grid:

 

 

 

Electricity cost
(excl. VAT)

 

Grid supplier:

 

 

Electricity tax

öre/kWh

Grid contract:

 

 

Energy tax

öre/kWh

 

 

 

 

 

 

Cost of electricity (excl. VAT)

 

 

 

 

 

Contract

SEK/month

 

 

 

 

Electricity transfer

öre/kWh

 

 

 

 

Power

SEK/kW/month

 

 

 

 

 

 

 

 

 

 

District heating (excl. VAT)

 

 

 

 

 

District heating supplier

 

 

Contract ID/type