Project Preparation Lists Before we formally start project, we will provide a customer list for the project preparations to be completed. POWER REQUIREMENT FOR EBOX INSTALLATION Total EIB20P-560180 kW, 310 ATotal EIB20P-420150 KW, 240 ATotal EIB20P-280106 KW, 170 ATotal EIB20A-102 2 KW, 16 A GENERAL INSTALLATION REQUIREMENTS Please note that the following items are not included as part of the EIB20P EIB20P-560/420/280 and EIB20A-102 delivery/works/onsite installations.Building permit and regulatory approval;400V power supply and connection;Calculation and construction of concrete slab for erection;Commissioning, tools, and spare parts;Refrigerant, glycol, or oils;Emptying, filling, and flushing of existing system;Electrical installation on site;Installation, configuration, and inspections against existing system;Installation, configuration, and inspections documents against existing system;Transport to the site and inbound transport;Pumps, piping, valves or other parts outside the EBoxmodule. Liquid media for EIB20P_560 + EIB20A_102 (one full EIB = 8 x HPM70)Brine In -5°C to +5°C, DT 3 KDN200 Heating Water Out560 kWB/W 0/55°C, DT 10 KDN125max. 60°CDomestic Hot WaterUp to 280 kW55°CDN54 Electrical EIB20P_560 (a full EIB = 8 x HPM70)Connecting to Grid193 kW400 V320A