Project Preparation Lists 

Before we formally start project, we will provide a customer list for the project preparations to be completed.

POWER REQUIREMENT FOR EBOX INSTALLATION

Total EIB20P-560

180 kW, 310 A

Total EIB20P-420

150 KW, 240 A

Total EIB20P-280

106 KW, 170 A

Total EIB20A-102

    2 KW, 16 A

GENERAL INSTALLATION REQUIREMENTS 

Please note that the following items are not included as part of the EIB20P EIB20P-560/420/280 and EIB20A-102 delivery/works/onsite installations.

  • Building permit and regulatory approval;
  • 400V power supply and connection;
  • Calculation and construction of concrete slab for erection;
  • Commissioning, tools, and spare parts;
  • Refrigerant, glycol, or oils;
  • Emptying, filling, and flushing of existing system;
  • Electrical installation on site;
  • Installation, configuration, and inspections against existing system;
  • Installation, configuration, and inspections documents against existing system;
  • Transport to the site and inbound transport;
  • Pumps, piping, valves or other parts outside the EBoxmodule.

Liquid media for EIB20P_560 + EIB20A_102 (one full EIB = 8 x HPM70)

Brine In

 

-5°C to +5°C, DT 3 K

DN200

 

Heating Water Out

560 kW

B/W 0/55°C, DT 10 K

DN125

max. 60°C

Domestic Hot Water

Up to 280 kW

55°C

DN54

 

Electrical EIB20P_560  (a full EIB = 8 x HPM70)

Connecting to Grid

193 kW

400 V

320A